• Project Name: Well study and evaluation for existing water well
  • Project Owner: Deep Element Co.
  • Drilling Contractor: Al-khdair Co.
  • Project Consultant: SUMER.
  • Location: Al-Azraq
  • Scope Of Work: Scope of Work: Site Visit for Drilled Water Wells

This scope of work outlines the procedures and objectives for conducting a site visit to assess the current condition of drilled water wells. The aim is to gather comprehensive data, make observations, and provide recommendations to ensure the optimal functionality and longevity of the wells.

Objectives :

  • To evaluate the current condition of the drilled water wells.
  • To identify any potential issues or areas of concern.
  • To provide actionable recommendations for maintenance, repairs, or improvements.

Task :

Pre-Visit Preparation :

  • Review existing documentation and historical data of the wells.
  • Prepare necessary equipment for inspection and data collection.
  • Coordinate with on-site personnel for access and safety protocols.

Site Visit and Inspection :

  • Conduct a visual inspection of the well site, including the surrounding area.
  • Assess the structural integrity of the well casing and other visible components.
  • Measure and record the depth of the well and water level.
  • Perform a CCTV inspection to examine the internal conditions of the well casing and borehole.
  • Document any signs of wear, corrosion, or damage to the well structure.

Observations and Data Analysis:

  • Analyze the collected data to identify trends or anomalies.
  • Evaluate the effectiveness of the current well design and construction.
  • Assess the condition of the well casing based on visual and CCTV inspections.

Recommendations :

  • Provide detailed recommendations for addressing any identified issues.
  • Suggest maintenance or repair actions to enhance well performance.
  • Recommend any upgrades or modifications to improve the well's longevity and efficiency.
  • Propose a schedule for regular inspections and maintenance to prevent future issues.

Deliverables :

  • A comprehensive report detailing the findings from the site visit.
  • Visual documentation, including photographs and CCTV footage.
  • A summary of observations and data analysis.
  • A list of actionable recommendations with prioritized actions.

Team and Responsibilities :

  • Lead Inspector: Responsible for overseeing the site visit and ensuring all tasks are completed.
  • Data Analyst: Responsible for analyzing collected data and assisting in report preparation.
  • Technical Support: Assists with equipment setup, data collection, and any on-site technical needs.

Safety and Compliance :

  • Ensure all team members adhere to safety protocols and wear appropriate personal protective equipment (PPE).
  • Comply with local regulations and guidelines related to well inspection and water quality testing.

Conclusion

The successful completion of this scope of work will provide a thorough understanding of the current condition of the drilled water wells, along with actionable recommendations to improve their performance and longevity.