
Geophysical Survey For Drilling Water Well In NPC
- Project name: Application of Electrical Resistivity Tomography (ERT) for GROUNDWATER PROSPECTING
- Project owner: National Poultry Co.
- Drilling contractor: under processing
- Location: Jordan- Al-karak
- Scope of work: At SUMER, we conduct an Electrical Resistivity Tomography (ERT) survey to accurately identify the water aquifer and determine the expected depth. Based on the findings of the survey, we can design the optimal well construction plan to ensure efficient and effective water extraction.
continue reading
Related Posts
CSAMT Phase II survey to assess groundwater potentials in Bishreyyah, 25 km NW of Azraq, within B2/A7 aquifer zones.
Comprehensive well supervision and consultation services for Medjool Village Co. in Al Karamah, ensuring efficient groundwater development through expert design, tendering, and drilling oversight.
ERT survey for groundwater exploration in Al-Dlail, assessing aquifers, well conditions, and water fluctuations. Includes geological study and pump inspection.
