
- Project Name: Supervision, Consultancy and Management Services for Drilling a Production Water Well for Arab Potash Company at Ghour Essal & Township
- Project Owner: Arab Potach Co. (APC).
- Project Contractor: Technical Dimension for Services & Well Drilling Company (TD).
- Project Consultant: SUMER for Geological and Hydrogeological Consultation Company.
- Location: APC township.
- Scope of Work
- Comprehensive Supervision
Provide full supervision of the contractor's work throughout the entire drilling process, ensuring adherence to safety procedures and compliance with the terms of the mutual drilling contract, while representing the client at all project stages. - Daily Monitoring and Guidance
Continuously monitor and oversee day-to-day drilling, cementing, and installation activities at the site. Offer on-site guidance to the drilling contractor regarding the sequence and implementation of drilling operations. - Work Oversight and Sample Collection
Follow up on all drilling activities, ensuring proper collection of cutting samples to verify sufficient penetration of targeted water-bearing layers and conducting geological analysis of the samples. - Pumping Test Supervision and Analysis
Supervise the pumping test, analyze its results, and prepare a detailed report. Based on the results, determine the type and technical specifications of the required pump. Provide recommendations for the best available pump options in the local market, considering capacity and suitability. - Review and Approval of Contractor Submittals
Review and approve all contractor submittals, including but not limited to designs, drawings, queries, specifications, method statements, calculations, and other relevant data. - Final Technical Reporting
Ensure a comprehensive final technical report is submitted by the client, including all details of the drilling operations, pumping test results, geological descriptions, and any other relevant information.
continue reading
Related Posts
ERT survey for groundwater exploration in Al-Dlail, assessing aquifers, well conditions, and water fluctuations. Includes geological study and pump inspection.
A CSAMT geophysical survey to explore groundwater in Bishreyyah, Jordan, with MWI and Sumer Consultants. It includes data analysis, calibration, and report preparation for Phase II.
SUMER conducted GPR surveys for Al Al-Bayt University in Safawi, providing 2D/3D data, processed results, and a technical report, ensuring detailed subsurface analysis.